Product Details






Parameter of Gym Equipment Parts
Material available | steel, brass, titanium, plastic, organic glass, wood, etc. |
Surface treatment | sandblasting, anodizing, electroplating, powder coating, baking varnish, etc. |
Processing | turning, milling, drilling, wire EDM, welding, casting, forging, assembling, etc. |
Tolerance | +/-0.001mm or +/- 0.00004" |
Certification | ISO9001:2008, |
Production capacity | depend on the complicacy of different products and the quantity |
Packaging | standard export carton with pallet or as per customer requirement |
Lead time | making arrangement upon customers'request |
Term of Payment | T/T, L/C |





Why choose us?
1-Professional designers, engineers and after-sales service team will follow up and serve your project.
2- Support multiple payment methods: T/T, L/C
3- Fast delivery: The best mold manufacturing lead time is 15 days.
5- Best service: All inquiries will be answered within 4 hours.
6-Quality control: We have obtained ISO9001:2008 certificate and strictly follow the quality system standards.
7-Professional design: We have a variety of mold design software that can open various files. We also have professional mold design engineers. We will also design 3D engineering drawings for you for free.
Hot Tags: injection molding hollow parts, China injection molding hollow parts manufacturers, suppliers, Fitness Gear Parts, Gym Replacement Parts, Metal Insert Plastic Injection Molding factory, Gym Equipment Spare Parts factory, Gym Equipment Parts, Gym Equipment Spare Parts






