Rich production experience, strict scientific management, so that our High Pressure Die Casting Aluminum, Auto Parts factory, Die Casting Auto Part factory get inspection certificate. We carry out brand operation strategy, so that the company's products have excellent cost performance and efficient and quick service characteristics. Our company pursues providing customers with satisfactory pre-sales, in-sales, and after-sales services, which is also the theme of our company's pursuit of eternal development of the enterprise. Our mission is to deliver consistently superior value to our customers and their clients. We are constantly improving ourselves, improving product quality and gradually climbing to a new level in the market. We will continue to publicize this valuable enterprise personality.
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.






Plastic injection molding application

Plastic injection parts application

Parameter of Gym Equipment Parts
Material available | steel, brass, titanium, plastic, organic glass, wood, etc. |
Surface treatment | sandblasting, anodizing, electroplating, powder coating, baking varnish, etc. |
Processing | turning, milling, drilling, wire EDM, welding, casting, forging, assembling, etc. |
Tolerance | +/-0.001mm or +/- 0.00004" |
Certification | ISO9001:2008, |
Production capacity | depend on the complicacy of different products and the quantity |
Packaging | standard export carton with pallet or as per customer requirement |
Lead time | making arrangement upon customers'request |
Term of Payment | T/T, L/C |



Injection process

FAQ
Q1. Are you a factory or trade company?
We are a factory located in xiamen City, China. Welcome to visit our factory
Q2. What kind of production service do you provide?
All kinds of plastic parts widely used for industrial, such as various industrial equipment components
Q3. How about the lead time?
Mould : 15~30 days
Mass production : 7~15 days
Q4. How about your quality?
♦Our management and production executed strictly according to ISO9001 : 2008 quality System.
♦We will make the operation instruction once the sample is approval.
♦ We will 100% inspect the products before shipment.
♦If there is quality problem, we will supply the replacement by our shipping cost.
Q5. How long should we take for a quotation?
After receiving detail information we will quote within 2 days.
Q6. What is your quotation element?
Drawing or Sample, Material, finish and Quantity.
Q7. What is your payment term?
Mould : 30% prepaid, 40% after the mould finish, balance after sample approval.
Goods : 30% prepaid, balance T/T before shipment.
We adhere to the product positioning of specialized and high-quality, and take the creation of high-end brands as our own responsibility, leading the domestic and even global OEM Steel Fabrication Laser Cutting Sheet Metal Stamping Spare Parts products to be personalized and intelligent. We select professional management personnel and construction personnel with high ideological quality and strong professional ability to form a working team. We are forging ahead, boldly reforming and tapping potential, and optimizing management to enhance efficiency.

