We are willing to cooperate with colleagues at home and abroad to make contributions to the development of Remote Control Plastic Cover, Injection Molded Parts, Cnc Milling Aluminum Parts for the industry. Our company takes the customer demand as the guidance, strives for the survival by the quality prestige. While meeting domestic market demand, the company is actively developing international markets.
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.






Plastic injection molding application

Plastic injection parts application

Parameter of Gym Equipment Parts
Material available | steel, brass, titanium, plastic, organic glass, wood, etc. |
Surface treatment | sandblasting, anodizing, electroplating, powder coating, baking varnish, etc. |
Processing | turning, milling, drilling, wire EDM, welding, casting, forging, assembling, etc. |
Tolerance | +/-0.001mm or +/- 0.00004" |
Certification | ISO9001:2008, |
Production capacity | depend on the complicacy of different products and the quantity |
Packaging | standard export carton with pallet or as per customer requirement |
Lead time | making arrangement upon customers'request |
Term of Payment | T/T, L/C |



Injection process

FAQ
Q1. Are you a factory or trade company?
We are a factory located in xiamen City, China. Welcome to visit our factory
Q2. What kind of production service do you provide?
All kinds of plastic parts widely used for industrial, such as various industrial equipment components
Q3. How about the lead time?
Mould : 15~30 days
Mass production : 7~15 days
Q4. How about your quality?
♦Our management and production executed strictly according to ISO9001 : 2008 quality System.
♦We will make the operation instruction once the sample is approval.
♦ We will 100% inspect the products before shipment.
♦If there is quality problem, we will supply the replacement by our shipping cost.
Q5. How long should we take for a quotation?
After receiving detail information we will quote within 2 days.
Q6. What is your quotation element?
Drawing or Sample, Material, finish and Quantity.
Q7. What is your payment term?
Mould : 30% prepaid, 40% after the mould finish, balance after sample approval.
Goods : 30% prepaid, balance T/T before shipment.
Our target is always to satisfy our customers by offering golden support, superior value and high quality for OEM Customized Running Machine Treadmill/Spinning Bike Parts with Casting and Machining. We value your inquiry, For more details, please contact us, we will reply you ASAP! As long as you order our products, no matter where you are, we will send professional technicians to serve you in time.

