Over the years, the company has been committed to the design, manufacturing and sales for Blister Mold, Precision Turned Parts, Silicone Injection Mould factory. Our company has established a good and stable partnership with many well-known brand companies abroad. We take responsibility serious, focus on the product itself, and always adhere to one brand and one standard to serve the market. If there is anything we can do for you, we shall be more than pleased to do so. With the aim of qualified quality, affordable price and good after-sales service, your satisfaction is our constant pursuit.
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.






Plastic injection molding application

Plastic injection parts application

Parameter of Gym Equipment Parts
Material available | steel, brass, titanium, plastic, organic glass, wood, etc. |
Surface treatment | sandblasting, anodizing, electroplating, powder coating, baking varnish, etc. |
Processing | turning, milling, drilling, wire EDM, welding, casting, forging, assembling, etc. |
Tolerance | +/-0.001mm or +/- 0.00004" |
Certification | ISO9001:2008, |
Production capacity | depend on the complicacy of different products and the quantity |
Packaging | standard export carton with pallet or as per customer requirement |
Lead time | making arrangement upon customers'request |
Term of Payment | T/T, L/C |



Injection process

FAQ
Q1. Are you a factory or trade company?
We are a factory located in xiamen City, China. Welcome to visit our factory
Q2. What kind of production service do you provide?
All kinds of plastic parts widely used for industrial, such as various industrial equipment components
Q3. How about the lead time?
Mould : 15~30 days
Mass production : 7~15 days
Q4. How about your quality?
♦Our management and production executed strictly according to ISO9001 : 2008 quality System.
♦We will make the operation instruction once the sample is approval.
♦ We will 100% inspect the products before shipment.
♦If there is quality problem, we will supply the replacement by our shipping cost.
Q5. How long should we take for a quotation?
After receiving detail information we will quote within 2 days.
Q6. What is your quotation element?
Drawing or Sample, Material, finish and Quantity.
Q7. What is your payment term?
Mould : 30% prepaid, 40% after the mould finish, balance after sample approval.
Goods : 30% prepaid, balance T/T before shipment.
Since its development, the company has become a professional provider of high-efficiency Motor Heat Shield Carbon Fiber Parts for Ducati V4 2018 integrating R&D, production, sales and application solutions. We provide customers with scientific solutions and continue to optimize them to help customers create greater value in various fields. With our professional pursuit of excellence, pragmatic and efficient work style and cohesive teamwork, we ensure that we will continue to provide customers with excellent products and services.

