We have further increased the manufacturing and sales of various new products, ensuring that our Plastic Injection Molds For Pipe Connector, Injection Molding Complex Parts, Wire EDM Wear Parts factory is at an advanced level in the industry, and achieving the strategic goal of sustainable development. Encouraged with the fast producing current market on the speedy foodstuff and beverage consumables all around the entire world, We're hunting forward to functioning with partners/clients to create good results together. Since our establishment, we have implemented the corporate tenet of 'pursuing high-tech, casting national brands, and providing diversified services'. We continue to innovate, surpass ourselves, think about customers, and strive to create the greatest benefits for customers! Our company adheres to the development concept of honesty and actively fulfills economic and social responsibilities. We have been based on sincere communication and pursuit excellence quality as corporate purpose, focused on providing customers with excellent products and services.
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.






Plastic injection molding application

Plastic injection parts application

Parameter of Gym Equipment Parts
Material available | steel, brass, titanium, plastic, organic glass, wood, etc. |
Surface treatment | sandblasting, anodizing, electroplating, powder coating, baking varnish, etc. |
Processing | turning, milling, drilling, wire EDM, welding, casting, forging, assembling, etc. |
Tolerance | +/-0.001mm or +/- 0.00004" |
Certification | ISO9001:2008, |
Production capacity | depend on the complicacy of different products and the quantity |
Packaging | standard export carton with pallet or as per customer requirement |
Lead time | making arrangement upon customers'request |
Term of Payment | T/T, L/C |



Injection process

FAQ
Q1. Are you a factory or trade company?
We are a factory located in xiamen City, China. Welcome to visit our factory
Q2. What kind of production service do you provide?
All kinds of plastic parts widely used for industrial, such as various industrial equipment components
Q3. How about the lead time?
Mould : 15~30 days
Mass production : 7~15 days
Q4. How about your quality?
♦Our management and production executed strictly according to ISO9001 : 2008 quality System.
♦We will make the operation instruction once the sample is approval.
♦ We will 100% inspect the products before shipment.
♦If there is quality problem, we will supply the replacement by our shipping cost.
Q5. How long should we take for a quotation?
After receiving detail information we will quote within 2 days.
Q6. What is your quotation element?
Drawing or Sample, Material, finish and Quantity.
Q7. What is your payment term?
Mould : 30% prepaid, 40% after the mould finish, balance after sample approval.
Goods : 30% prepaid, balance T/T before shipment.
We are in a relatively high position in the industry, and we maintain close cooperation with foreign suppliers to provide Customized Stainless Steel Aluminum Precision Fitness Equipment Spare Parts, our products are exported to many countries and regions. We will initiate the second phase of our development strategy. We are recognized by the industry for our integrity, strength and product quality.

