Our rigorous quality management, mature and excellent technology, and advanced and complete test methods are reliable guarantees of the quality of our CNC Machining Parts factory, Zinc Die Casting Products, 3d Printing Automotive Parts. We strictly implement production and sale in accordance with international standards, and improve the management level of the enterprise, which laid a solid foundation for the enterprise to move forward in the direction of standardization and scale. The advanced management concept, reasonable strategic planning, and the combination with advanced logistics technology directly affect the economic results and social benefits of our operation.
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.






Plastic injection molding application

Plastic injection parts application

Parameter of Gym Equipment Parts
Material available | steel, brass, titanium, plastic, organic glass, wood, etc. |
Surface treatment | sandblasting, anodizing, electroplating, powder coating, baking varnish, etc. |
Processing | turning, milling, drilling, wire EDM, welding, casting, forging, assembling, etc. |
Tolerance | +/-0.001mm or +/- 0.00004" |
Certification | ISO9001:2008, |
Production capacity | depend on the complicacy of different products and the quantity |
Packaging | standard export carton with pallet or as per customer requirement |
Lead time | making arrangement upon customers'request |
Term of Payment | T/T, L/C |



Injection process

FAQ
Q1. Are you a factory or trade company?
We are a factory located in xiamen City, China. Welcome to visit our factory
Q2. What kind of production service do you provide?
All kinds of plastic parts widely used for industrial, such as various industrial equipment components
Q3. How about the lead time?
Mould : 15~30 days
Mass production : 7~15 days
Q4. How about your quality?
♦Our management and production executed strictly according to ISO9001 : 2008 quality System.
♦We will make the operation instruction once the sample is approval.
♦ We will 100% inspect the products before shipment.
♦If there is quality problem, we will supply the replacement by our shipping cost.
Q5. How long should we take for a quotation?
After receiving detail information we will quote within 2 days.
Q6. What is your quotation element?
Drawing or Sample, Material, finish and Quantity.
Q7. What is your payment term?
Mould : 30% prepaid, 40% after the mould finish, balance after sample approval.
Goods : 30% prepaid, balance T/T before shipment.
Since establishment, our company has always adhered to the business philosophy of 'people-oriented, unity and enterprising, technology-led, quality first', and constantly strengthens the corporate organization and enhances corporate strength. We are willing to create excellent Customized Plastic Moulded Electronic Products Molding Parts by Injection Moulding for all sectors of society. Relying on the huge production capacity and service capacity, we will make the most rapid feedback for your orders and needs. We actively practice social responsibility while enhancing the comprehensive strength and achieving rapid development of the enterprise.

