After hard work and innovation, and years of professional accumulation, our company has developed into the largest Bbq Spring Handles, Cnc Machining Plastic Parts, Connector Injection Molding manufacturer in China. We always focus on sustainable development and scientific management. Our company holds the banner of revitalizing the industry, and works together with friends from all walks of life on the road of high and new technology to forge ahead, we develop together and create a better tomorrow. In the current environment of rapid economic development, we have set predictable visionary goals and practical strategic measures. We hold high the banner of 'being needed', adhere to the principle of 'user first' and practice the characteristic corporate culture of integration of openness and inclusiveness.
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.






Plastic injection molding application

Plastic injection parts application

Parameter of Gym Equipment Parts
Material available | steel, brass, titanium, plastic, organic glass, wood, etc. |
Surface treatment | sandblasting, anodizing, electroplating, powder coating, baking varnish, etc. |
Processing | turning, milling, drilling, wire EDM, welding, casting, forging, assembling, etc. |
Tolerance | +/-0.001mm or +/- 0.00004" |
Certification | ISO9001:2008, |
Production capacity | depend on the complicacy of different products and the quantity |
Packaging | standard export carton with pallet or as per customer requirement |
Lead time | making arrangement upon customers'request |
Term of Payment | T/T, L/C |



Injection process

FAQ
Q1. Are you a factory or trade company?
We are a factory located in xiamen City, China. Welcome to visit our factory
Q2. What kind of production service do you provide?
All kinds of plastic parts widely used for industrial, such as various industrial equipment components
Q3. How about the lead time?
Mould : 15~30 days
Mass production : 7~15 days
Q4. How about your quality?
♦Our management and production executed strictly according to ISO9001 : 2008 quality System.
♦We will make the operation instruction once the sample is approval.
♦ We will 100% inspect the products before shipment.
♦If there is quality problem, we will supply the replacement by our shipping cost.
Q5. How long should we take for a quotation?
After receiving detail information we will quote within 2 days.
Q6. What is your quotation element?
Drawing or Sample, Material, finish and Quantity.
Q7. What is your payment term?
Mould : 30% prepaid, 40% after the mould finish, balance after sample approval.
Goods : 30% prepaid, balance T/T before shipment.
All Custom Spare Parts for Fitness Equipment of our company adopt the industry standard. Our products are exported to overseas and enjoy a good reputation in many overseas markets. The development of modern science and technology makes our products constantly innovate, and pay more attention to humanization to improve customer satisfaction. In line with the quality policy of 'striving for quality, excellent service', we give full play to our strong R&D advantages to provide customers with excellent products and better services.

