Each process has strict quality standards, which have been checked at various levels, so that the quality of our Pvc Blister Mold factory, Connector Injection Molding factory, Gym Replacement Parts factory has been fully guaranteed. To improved expand market, we sincerely invite ambitious individuals and providers to hitch as an agent. Our company sticks to the principles of efficient management, innovative technology, and satisfactory services to clients. We are willing to share our talents, technology and experience with clients all over the world! In terms of technology, we continue to increase R&D investment, optimize product structure, and improve product performance to satisfy the requirements of customers. We keep up with the market pulse, while adhering to advanced production and quality inspection equipment, we actively select outstanding talents and continue to develop and innovate.
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.






Plastic injection molding application

Plastic injection parts application

Parameter of Gym Equipment Parts
Material available | steel, brass, titanium, plastic, organic glass, wood, etc. |
Surface treatment | sandblasting, anodizing, electroplating, powder coating, baking varnish, etc. |
Processing | turning, milling, drilling, wire EDM, welding, casting, forging, assembling, etc. |
Tolerance | +/-0.001mm or +/- 0.00004" |
Certification | ISO9001:2008, |
Production capacity | depend on the complicacy of different products and the quantity |
Packaging | standard export carton with pallet or as per customer requirement |
Lead time | making arrangement upon customers'request |
Term of Payment | T/T, L/C |



Injection process

FAQ
Q1. Are you a factory or trade company?
We are a factory located in xiamen City, China. Welcome to visit our factory
Q2. What kind of production service do you provide?
All kinds of plastic parts widely used for industrial, such as various industrial equipment components
Q3. How about the lead time?
Mould : 15~30 days
Mass production : 7~15 days
Q4. How about your quality?
♦Our management and production executed strictly according to ISO9001 : 2008 quality System.
♦We will make the operation instruction once the sample is approval.
♦ We will 100% inspect the products before shipment.
♦If there is quality problem, we will supply the replacement by our shipping cost.
Q5. How long should we take for a quotation?
After receiving detail information we will quote within 2 days.
Q6. What is your quotation element?
Drawing or Sample, Material, finish and Quantity.
Q7. What is your payment term?
Mould : 30% prepaid, 40% after the mould finish, balance after sample approval.
Goods : 30% prepaid, balance T/T before shipment.
We continue to take our product line to the next level by developing new products and improving existing product designs to provide our customers with the best CNC Machining Aluminum Gym Fitness Equipment Spare Parts on the market. Our company always adhere to quality first, we serve our customers attentively and strive to improve our professional level. Satisfactory service and high-quality products are our unremitting pursuit and driving force. With the purpose of common development, we cooperate with professional enterprises at home and abroad, actively develop business, and form a distinctively characteristic industrialized management development model.

