After years of steady development, we have developed a comprehensive capability to develop Cnc Milling Aluminum Parts, Spring Parts factory, Wire EDM Spare Parts factory and operate our business. Therefore, employees must have a sense of loyalty to the company, a sense of mission, a strong sense of responsibility for their work, the courage to assume responsibility and perform their duties. We continuously provide better, newer and more comprehensive technical support to new and old customers.
Among the injection molding parts used, a type of calendering is mostly used for thermoplastics. It is a process in which plasticized plastics are sent to multiple sets of parallel, counter-rotating hot rollers. . Multi-production film or sheet, one is cast molding, multi-purpose dry thermoplastics. This is to dissolve the solvent-soluble plastic on the continuous running metal belt to form a thin layer of uniform thickness. After heating, the tincture of the instrument volatilizes, and the product solidifies and forms a film or sheet. Finally, it is extruded. Extrusion is mostly used for thermoplastics. This is the plastic that will melt. Extruded through the mouth gap of the die at the head of the extruder to form a profile similar to the shape of the mouth of the die. More production of plates, pipes, rods, wires, profiles and so on.



Injection process

Parameter of Gym Equipment Parts
Material available | steel, brass, titanium, plastic, organic glass, wood, etc. |
Surface treatment | sandblasting, anodizing, electroplating, powder coating, baking varnish, etc. |
Processing | turning, milling, drilling, wire EDM, welding, casting, forging, assembling, etc. |
Tolerance | +/-0.001mm or +/- 0.00004" |
Certification | ISO9001:2008, |
Production capacity | depend on the complicacy of different products and the quantity |
Packaging | standard export carton with pallet or as per customer requirement |
Lead time | making arrangement upon customers'request |
Term of Payment | T/T, L/C |




FAQ
1. Are you a trading company or a manufacturer?
We are a manufacturer as you can see our workshop as above.
2. What kind of trade terms can you do?
EX-WORKS,FOB,CIF,DDP DDU
3. What is your terms of payment?
50% Mold cost deposit,balance mold cost +50% production cost paid when samples confimed,Balance production cost paid against copy of B/L. We accept T/T
4. Do you support OEM ?
Yes, we can produce by technical drawings or samples.
5. How about your delivery time?
Generally, it take 40 days ( 30 days do mold and 10 days do mass production).
We provide products, services and solutions to help customers improve safety and process efficiency, reduce waste, extend service life of Bronze Investment Casting/Cast Steel Impeller for Oil and Gas achieving the sustainable development. We are always high quality and effective for the objective of customer satisfaction with the aim of optimizing and continuously improving products, innovation. In terms of sales, we will strengthen the summary of market information and comprehensive customer feedback, effectively solving the problems encountered by consumers, and provide after-sales services.

