Based on the domestic market, we serve global customers, deepen the industrial chain, optimize industrial services, and strive to become a world-class glass Steel Turned Parts, Small Springs With Hooks factory, Copper Die Casting Mold manufacturer. Within our initiatives, we already have many shops in China and our solutions have won praise from prospects around the globe. At present, our company has a group of high-quality technicians and sales teams. According to the product requirements of different fields, the products under different working conditions are produced. We provide wholesale prices on all our quality parts so you are guaranteed greater savings.
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.






Plastic injection molding application

Plastic injection parts application

Parameter of Gym Equipment Parts
Material available | steel, brass, titanium, plastic, organic glass, wood, etc. |
Surface treatment | sandblasting, anodizing, electroplating, powder coating, baking varnish, etc. |
Processing | turning, milling, drilling, wire EDM, welding, casting, forging, assembling, etc. |
Tolerance | +/-0.001mm or +/- 0.00004" |
Certification | ISO9001:2008, |
Production capacity | depend on the complicacy of different products and the quantity |
Packaging | standard export carton with pallet or as per customer requirement |
Lead time | making arrangement upon customers'request |
Term of Payment | T/T, L/C |



Injection process

FAQ
Q1. Are you a factory or trade company?
We are a factory located in xiamen City, China. Welcome to visit our factory
Q2. What kind of production service do you provide?
All kinds of plastic parts widely used for industrial, such as various industrial equipment components
Q3. How about the lead time?
Mould : 15~30 days
Mass production : 7~15 days
Q4. How about your quality?
♦Our management and production executed strictly according to ISO9001 : 2008 quality System.
♦We will make the operation instruction once the sample is approval.
♦ We will 100% inspect the products before shipment.
♦If there is quality problem, we will supply the replacement by our shipping cost.
Q5. How long should we take for a quotation?
After receiving detail information we will quote within 2 days.
Q6. What is your quotation element?
Drawing or Sample, Material, finish and Quantity.
Q7. What is your payment term?
Mould : 30% prepaid, 40% after the mould finish, balance after sample approval.
Goods : 30% prepaid, balance T/T before shipment.
We introduce domestic and foreign advanced production equipment, production technology, strong technical force, and advanced management mode, and continue to innovate and improve our Auto Part Made of Silicone Rubber with ISO 9001 From China. We will continue to carry forward the enterprise spirit of 'unity, diligence, efficiency, and innovation', adhere to the marketing strategy of 'quality-oriented, honesty first', and strive to create a more brilliant tomorrow. In the ever-developing market, we strive to improve the entire operating system from market operation to sales and service.

