Products
Aluminum Casting and Grey Iron Casting Auto Engine Parts

Aluminum Casting and Grey Iron Casting Auto Engine Parts

Material available: steel, brass, titanium, plastic, organic glass, wood, etc.
Surface treatment: sandblasting, anodizing, electroplating, powder coating, baking varnish, etc.
Processing: turning, milling, drilling, wire EDM, welding, casting, forging, assembling, etc.
Tolerance: +/-0.001mm or +/- 0.00004"
Send Inquiry

The complete variety, novel design, and excellent quality of our CNC Machining Parts factory, EDM Spare Parts, CNC Milling Parts have impressed our customers both at home and abroad. Our business management philosophy is to provide systematic, fast, high-quality services, exceeding customer expectations, and creating value for customers. We sincerely look forward to and believe that we can achieve mutual benefit and win-win results with all customers and colleagues, and create a better future.

1. Start from part design analysis.

2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.

3. If product is complex, moldflow report will be present as well.

4. Indoor workshop ensures you high quality under good control.

5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.



2db34cf6-1b1a-4e45-874a-2f6a05d7130f710b8088-1789-4460-b58e-979525764b065650efdc-bb3f-40cf-b7f6-dcac9c9beffe

a7d39fa4-cde3-4c12-a99a-33eadb0bcdcec05f276a-aa1b-4979-b1cc-380f566102aaba796dd2-b391-4663-b930-f0e5f7fe54a4

Plastic injection molding application

plastic injection molding application

Plastic injection parts application

plastic injection parts application


Parameter of Gym Equipment Parts


Material available

steel, brass, titanium, plastic, organic glass, wood, etc.

Surface treatment

sandblasting, anodizing, electroplating, powder coating, baking varnish, etc.

Processing

turning, milling, drilling, wire EDM, welding, casting, forging, assembling, etc.

Tolerance

+/-0.001mm or +/- 0.00004"

Certification

ISO9001:2008,

Production capacity

depend on the complicacy of different products and the quantity

Packaging

standard export carton with pallet or as per customer requirement

Lead time

making arrangement upon customers'request

Term of Payment

T/T, L/C

our factory

machining parts packing

certificate

Injection process

injection process


FAQ

Q1. Are you a factory or trade company?

We are a factory located in xiamen City, China. Welcome to visit our factory

Q2. What kind of production service do you provide?

All kinds of plastic parts widely used for industrial, such as various industrial equipment components

Q3. How about the lead time?

Mould : 15~30 days

Mass production : 7~15 days

Q4. How about your quality?

♦Our management and production executed strictly according to ISO9001 : 2008 quality System.

♦We will make the operation instruction once the sample is approval.

♦ We will 100% inspect the products before shipment.

♦If there is quality problem, we will supply the replacement by our shipping cost.

Q5. How long should we take for a quotation?

After receiving detail information we will quote within 2 days.

Q6. What is your quotation element?

Drawing or Sample, Material, finish and Quantity.

Q7. What is your payment term?

Mould : 30% prepaid, 40% after the mould finish, balance after sample approval.

Goods : 30% prepaid, balance T/T before shipment.


We can provide sample designing, mass production, produce well-pleasing Aluminum Casting and Grey Iron Casting Auto Engine Parts to clients, and create the satisfactional quality as well! Welcome to visit us at any time for business relationship established. Mainly do wholesale, so we have the most competitive price, but highest quality.

Send Inquiry